Building 18

Building 18

Project Status - Construction Pending

May 22, 2016
Building 18 Second Floor Remodel

  • The project is now in the Construction Document (CD) phase, during which the architects and engineers continue to detail the plans for permit submission in early June. 
  • The design team is continuing to work with the Energy Trust of Oregon on possible incentives. 
  • The Construction Manager/General Contractor is working with the team on cost estimating and cost controlling.
  • This project has received a seismic grant which will enable us to bring the building up to current seismic life safety codes.
  • Construction is slated to begin in mid-July with substantial completion by December 5, 2016.

December 8, 2009
BOND UPDATE: BUILDING 18 GREEN PLUS
The Bond Leadership Team has recommended that this project be placed on hold pending a master plan study of the site to verify the location and single floor type construction proposed.  This project is now on hold status pending further study and review.  Contact Mark Richardson, (541) 463-3456

November 17, 2009
BOND UPDATE: BUILDING 18 GREEN PLUS OFFICE ADDITION
A floor plan has been selected allowing the architect to proceed with the process of an initial design of the office building. The building has some exciting futures built in allowing staff members to feel more comfortable in their surroundings. This building will have radiant floor heat to keep the office comfortable year round and a ventilation system that will be using 100 percent filtered outside air. Some other features added to the new offices are no VOC material, natural lighting, and polished concrete floors with no floor covering material. The first set of initial drawings is expected to be handed to LCC on Dec 3 showing some ideas of a building design and outlining some of the satiability features. Contact Mark Richardson, (541) 463-3456.

November 10, 2009
BOND UPDATE: BUILDING 18 GREEN PLUS OFFICE ADDITION
Lane community College has received a schematic design showing the foot print of the new offices. The drawings are currently being reviewed by the FMP planning team and comments are expected to be returned by Tuesday, November 10. Design development is expected to start November 12 and will be placed on a fast track so construction can start right away. Currently, the design shows a group of six offices with a specialized ventilation system to improve air quality. These sets of offices are specially designed to accommodate staff members that are sensitive to indoors and out door air quality.

November 3, 2009
BOND UPDATE: BUILDING 18 GREEN PLUS OFFICES
A conceptual design is expected to be presented to Lane this week showing a basic footprint of the offices and their location. Information on the building design is expected to be presented with additional information on requested special features to improve air quality.

August 31, 2009
PROJECT 451 UTILITY SUBMETERING
Completed meter installations this week: water meters for buildings 1, 2, and 5; electrical meters for buildings 1, 2, 3, 4, 5, 6, 7, 11, 18, 19, 24, 25, 26, and 27. Main building isolation valve replacements this week: domestic cold water in buildings 4, 5, and 6. In addition, eight water main valves were replaced. Contact Angela Fazio, (541) 463-3428.

August 18, 2009
PROJECT 451 UTILITY SUBMETERING
The following meter installations were completed this week: water, buildings 4, 17, 18, and 19; natural gas, building 19. Main isolation valve replacements this week: domestic cold water, buildings 2, 3, 18, and 19. Contact Angela Fazio, (541) 463-3428.

August 10, 2009
UTILITY SHUT DOWN SCHEDULED FOR AUGUST 21, 22, AND 23, 2009
Electricity will be shut down in Building 18 on August 22 and 23. Contact Mark Richardson, (541) 463-3426.

PROJECT 449 ASBESTOS ABATEMENT
Asbestos removal inside the tunnel is on schedule. The deferred maintenance crews working on insulating the pipes in the tunnel have temporarily been reassigned to help finish the smart classrooms. On August 7 Buildings 17 and 18 will have the HVAC system shut down to allow the contractor to remove asbestos fittings. Contact Mark Richardson, (541) 463-3426.

For additional information about the bond, contact Lane's Bond Project Managers.

If you have comments, questions or feedback concerning Lane's Bond, please email bond@lanecc.edu.